TracVision G8 Owner's Manual - Guide to Technical Information
Figure 5-15
PCB Module Connectors
102
11. Reconnect the cables that you removed in Steps 2
and 3. Be sure to reconnect all cables in their proper
positions. Figure 5-15 shows the proper connector
assignments.
TOP
Limit
Switches
LIMIT SWITCHES
BOTTOM
INTERNAL SENSOR
Internal
Sensor
To IRD
Azimuth/Roll
Gyro
AZIMUTH/ROLL GYRO
POWER
FUSE
ELEVATION GYRO
Elevation
Fuse
Power
Gyro
From LNB
Elevation & Azimuth
Motors
ELEVATION & AZIMUTH MOTORS
SKEW MOTOR
Skew Motor
54-0198