KVH Industries KVHTRACVISION G4 Technical Manual page 41

Satellite television
Table of Contents

Advertisement

TracVision G4 Technical Manual
Figure 2-19
Multiple Multiswitch Installation
(North American systems only)
Be sure to connect a ground cable
from each IRD to a suitable DC
ground, ideally the ADCU ground
terminal.
28
Multiple Multiswitch Installation
If you need to connect more than four IRDs to the TracVision
antenna, you may carry out a multiple multiswitch installation,
as shown in Figure 2-19.
DC Power
DC In
RHCP
VHF/UHF
+13v
Multiswitch
Out 1
Out 2
Out 3
IRD #1
IRD #2
IRD #3
Connecting the IRD Ground Wire
A grounding wire has been provided to connect your IRD to a
suitable ground. Attach the grounding wire to any suitable screw
on the rear panel of the IRD with a good contact with the IRD
chassis. The other end should be connected to a suitable DC
ground, ideally to the ADCU ground terminal (route the ground
wire to the ADCU and leave unconnected for now). Each IRD that
you connect to the TracVision system should have a similar
ground connection.
If you are using a multiswitch, you can ground the multiswitch instead
of the individual IRDs.
TracVision Antenna Baseplate
RF1
RF2
RF Splitters/
Power Dividers
LHCP
+18v
DC Power
Out 4
IRD #4
DC In
Out 1
IRD #5
IRD #6
Power
Data
RHCP
VHF/UHF
LHCP
+13v
+18v
Multiswitch
Out 2
Out 3
Out 4
IRD #7
IRD #8
54-0147

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Tracvision g4

Table of Contents