6. Reverse the PTT motor leads between
the battery terminals to fully extend the
trim and tilt rams.
Ram
PTT motor lead
Sky blue (Sb)
Up
Light green (Lg)
7. Remove the PTT oil pressure gauge
adapter set 2.
8. Install the pipe joints 1, and then tight-
ening them to the specified torque.
Pipe joint 1:
15 N·m (1.5 kgf·m, 11 ft·lb)
9. Connect the PTT motor leads to the bat-
tery terminals to fully retract the trim and
tilt rams.
10. Loosen the pipe joints 3, and then
remove the pipe joint b.
11. Install the PTT oil pressure gauge
adapter set 2.
69J3D11
NOTE:
Cover the removed pipe joint b with a rag.
Battery
terminal
+
-
12. Connect the PTT motor leads to the bat-
13. Reverse the PTT motor leads between
Power trim and tilt unit
PTT oil pressure gauge adapter set:
90890-06580
tery terminals to extend the tilt ram, and
then measure the hydraulic pressure.
Hydraulic pressure (up):
12.2–14.2 MPa (124–145 kgf/cm
the battery terminals to fully retract the
trim and tilt rams.
1
2
3
4
5
6
7
8
2
)
9
7-30