3. PERIODIC CHECK
3.15.2
Replacing the vertical conveyance clutch /1 (CL9) and /2 (CL10)
A. Periodically replaced parts/cycle
•
Vertical conveyance clutch /1 (CL9): Every 6,000,000 prints (once for every 4,500,000 prints for actual
replacement cycle)
•
Vertical conveyance clutch /2 (CL10): Every 6,000,000 prints (once for every 4,500,000 prints for actual
replacement cycle)
B. Procedure
[4]
108
[2]
[1]
[3]
[2]
57gaf2c195na
Field Service Ver2.0 Aug.2005
1.
Remove the right cover /Lw. (See "6.3.4 Remov-
ing/reinstalling the right cover /Lw.")
2.
Remove the connector [1].
3.
Remove 4 screws [2] and then remove the vertical
conveyance unit[3].
Note
• When placing the vertical conveyance unit [3],
be sure to place it with the jam open/close
door [4] down.