Testing For Proper Venting And Sufficient Combustion Air - Lennox G61MPV Service Manual

G61mpv series
Hide thumbs Also See for G61MPV:
Table of Contents

Advertisement

PLUG
(Must be
glued in
place)
1 − Use field−provided materials and the factory−provided
air intake screen to route the intake piping as shown in
figures 26 and 27. Maintain a minimum clearance of 3"
(76mm) around the air intake opening. The air intake
opening (with the protective screen) should always be
directed either downward or straight out. Use 2" pipe
and fittings only and make sure that the air intake does
not extend more than 6" beyond the G61MPV cabinet.
The air intake connector must not be located near
the floor. To avoid this complication in downflow
applications which do not include a downflow
evaporator coil, the intake air routing should be modi-
fied as shown in figure 27.
2 − Use a sheet metal screw to secure the intake pipe to the
connector, if desired. A pilot indentation is provided in the
slip connector to assist in locating and starting the fasten-
er.
3 − Glue the provided 2" plug into the unused air intake con-
nector on the opposite side of the cabinet.
TYPICAL AIR INTAKE PIPE CONNECTIONS
DOWNFLOW NON−DIRECT VENT APPLICATIONS
(Right−Hand Exit in Downflow Applications Shown)
6 in. Max.
INTAKE DEBRIS
SCREEN
(Provided)
Downflow
Evaporator
NOTE − Debris screen and sweep ell may be rotated, so that
Coil
screen may be positioned to face forward, backward or to the side.
FIGURE 27
Page 53
PLUG
(Must be
glued in
place)

Testing for Proper Venting and Sufficient Combustion Air

(Non−Direct Vent Applications Only)
WARNING
CARBON MONOXIDE POISONING HAZARD!
Failure to follow the steps outlined below for each
appliance connected to the venting system being
placed into operation could result in carbon monox-
ide poisoning or death.
The following steps shall be followed for each ap-
pliance connected to the venting system being
placed into operation, while all other appliances con-
nected to the venting system are not in operation.
After the G61MPV gas furnace has been started, the fol-
lowing test should be conducted to ensure proper venting
and sufficient combustion air has been provided to the
G61MPV, as well as to other gas-fired appliances which
are separately vented. The test should be conducted while
all appliances (both in operation and those not in operation)
are connected to the venting system being tested. If the
venting system has been installed improperly, or if provi-
sions have not been made for sufficient amounts of com-
bustion air, corrections must be made as outlined in the
previous section.
1 − Seal any unused openings in the venting system.
2 − Visually inspect the venting system for proper size and
horizontal pitch. Determine there is no blockage or re-
striction, leakage, corrosion, or other deficiencies
which could cause an unsafe condition.
2" SWEEP
ELL
INTAKE
DEBRIS
SCREEN
(Provided)
2"
18 in.
2" SWEEP ELL
Downflow Additive Flloor Base