Venting Systems; Through The Wall - Quadra-Fire MTV-E2-CSB Installation Manual

Mt. vernon e2 series
Hide thumbs Also See for MTV-E2-CSB:
Table of Contents

Advertisement

MT VERNON E2
5

Venting Systems

A. Through The Wall
Horizontal termination cap must be a minimum of 6 inches.
(152mm) from the wall. Approved for mobile home installa-
tions. Must use 3 or 4 inch (76-102mm) "L" or "PL" Listed
pellet venting or Listed double wall pipe and a Quadra-Fire
Outside Air Kit in mobile homes.
Straight Out
45 Degree
14
2 in [51mm] min
6 in
[152mm]
Min
Figure 14.1
Illustration shows venting going in both directions.
Choose which one is best for your installation.
6 in. (152mm)
Minimum
Wall
Thimble
2 in.
(51mm)
Minimum
Figure 14.2
NOTE:
In Canada, where passage through a wall or partition
of combustible construction is desired, the installation
shall conform to CAN/CSA-B365
Non-combustible Hearth Pad
6 in. (152mm)
Minimum
7080-131B
Horizontal
Termination
Cap
Wall
Thimble
6 in
[152mm]
Min
2 in. (51mm)
Minimum
March 14, 2014

Advertisement

Table of Contents
loading

Table of Contents