12
4.0 UNCRATING AND ASSEMBLY
4.1
CRATED UNIT CONTAINS
•
Primary Air Control Kit
•
Main / Electrical Harness Kit (1 pc.)
•
Bricks (37 pcs.)
•
Baffl es (2 pcs.)
•
Secondary Air Tubes (4 pcs.)
•
Installation and Operating Manual
•
Limit Switch Mount Bracket (Plenum) (1 pc.)
•
Stand Offs and Hardware
4.2
RECOMMENDED STEP
CAUTION
MANOUVERING AND PALLET
REMOVAL REQUIRES A MINIMUM
OF TWO PEOPLE.
THE BASE PALLET IS SECURED TO THE FURNACE BY ADJUSTING THE LEGS AT THE BOTTOM OF
THE BASE PALLET SHOULD NOT BE REMOVED UNTIL THE FURNACE IS PLACED CLOSE TO ITS
LIFTING OF THE FURNACE SHOULD BE THROUGH THE BASE PALLET - LIFTING OF FURNACE BY
If the crating is too large for manoeuvring in the doorways and staircases, remove the crate verticals, diagonals
and top pallet.
W415-0910 / A / 09.16.10
HIGH CENTRE OF GRAVITY! THIS UNIT IS VERY TOP
HEAVY! USE CAUTION WHEN MANOEUVRING OR
REMOVING THE FURNACE FROM THE BASE PALLET.
THE FURNACE.
FINAL INSTALLATION LOCATION!
METAL BASE HOUSING CAN RESULT IN DAMAGE
CAUTION
LIFTING
POINTS
LIFTING
POINTS