Appendix
17.3 Maintenance report
Sign for the maintenance activities that you have
carried out and enter the date.
Needs-dependent maintenance activities
1.
Clean the burner, the heat exchanger and the condensate
trap. First shut down the heating system
2.
Check and adjust the gas/air ratio
CO
content with full load
2
CO
content with partial load
2
3.
Confirm proper maintenance
We reserve the right to make any changes due to technical modifications!
Installation and Servicing Instructions Logamax plus GB142-24/30/45/60 • Version 12/2004
Page Date: _____________
46
31
_____________ inch W.C.
_______________ %
_______________ %
Company stamp/
Signature
Buderus Hydronic Systems • http://www.buderus.net
16
Date: _____________
_____________ inch W.C.
_______________ %
_______________ %
Company stamp/
Signature
93