12.0 Completion
12.1
Completion
Case Front Panel
1. Instruct the user in the operation of the boiler and
system including the integral timer, explaining the
operational sequence.
2. Set the central heating and hot water temperature
control knobs to the requirements of the user.
3. Carefully read and complete all sections of the Gas
Boiler Commissioning Checklist at the rear of this
publication that are relevant to the appliance and
installation. These details will be required in the event of
any warranty work. The publication must be handed to the
user for safe keeping and each subsequent regular service
visit recorded.
4. For IE, it is necessary to complete a "Declaration of
Conformity" to indicate compliance with I.S. 813. An
example of this is given in I.S. 813 "Domestic Gas
Installations". This is in addition to the Gas Boiler
Commissioning Checklist.
5. Hand over the Users Operating, Installation and
Servicing Instructions giving advice on the necessity of
regular servicing.
Facia Panel
Fig. 61
34
© Baxi Heating UK Ltd 2011
Supplied By www.heating spares.co Tel. 0161 620 6677