Commissioning Checklist - Baxi Megaflo System I5 HE IE Installation & Servicing Instructions Manual

Baxi megaflo system he ie range gas fired wall mounted condensing boiler
Hide thumbs Also See for Megaflo System I5 HE IE:
Table of Contents

Advertisement

GAS BOILER COMMISSIONING CHECKLIST
BOILER SERIAL No.
CONTROLS
TIME & TEMPERATURE CONTROL TO HEATING
TIME & TEMPERATURE CONTROL TO HOT WATER
HEATING ZONE VALVES
HOT WATER ZONE VALVES
THERMOSTATIC RADIATOR VALVES
AUTOMATIC BYPASS TO SYSTEM
SYSTEM CLEANING
THE SYSTEM HAS BEEN FLUSHED IN ACCORDANCE WITH THE BOILER MANUFACTURER'S INSTRUCTIONS?
THE SYSTEM CLEANER USED
THE INHIBITOR USED
IN OPERATION MEASURE & RECORD
GAS RATE
BURNER OPERATING PRESSURE (IF APPLICABLE)
CENTRAL HEATING FLOW TEMPERATURE
CENTRAL HEATING RETURN TEMPERATURE
CONFIRM THE FOLLOWING
THE CONDENSATE DRAIN HAS BEEN INSTALLED IN ACCORDANCE WITH
THE MANUFACTURER'S INSTRUCTIONS?
THE HEATING AND HOT WATER SYSTEM COMPLIES
WITH CURRENT BUILDING REGULATIONS
THE APPLIANCE AND ASSOCIATED EQUIPMENT HAS BEEN INSTALLED AND COMMISSIONED
IN ACCORDANCE WITH THE MANUFACTURER'S INSTRUCTIONS
IF REQUIRED BY THE MANUFACTURER, HAVE YOU RECORDED A CO/CO
THE OPERATION OF THE APPLIANCE AND SYSTEM
CONTROLS HAVE BEEN DEMONSTRATED TO THE CUSTOMER
THE MANUFACTURER'S LITERATURE HAS BEEN LEFT WITH THE CUSTOMER
COMMISSIONING ENG'S NAME
1
© Baxi Heating UK Ltd 2011
54
Supplied By www.heating spares.co Tel. 0161 620 6677
ROOM T/STAT & PROGRAMMER/TIMER
CYLINDER T/STAT & PROGRAMMER/TIMER
PRINT
SIGN
1.0 Introduction
FITTED
FITTED
FITTED
FITTED
RATIO READING?
N/A
2
ID No.
DATE
PROGRAMMABLE ROOMSTAT
COMBI BOILER
NOT REQUIRED
NOT REQUIRED
NOT REQUIRED
ft
m
/hr
3
N/A
mbar
°C
°C
YES
YES
CO/CO
RATIO
2
/hr
3
1

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents