Installation - Baxi Megaflo System I5 HE IE Installation & Servicing Instructions Manual

Baxi megaflo system he ie range gas fired wall mounted condensing boiler
Hide thumbs Also See for Megaflo System I5 HE IE:
Table of Contents

Advertisement

Fig. 30
145mm
For Side Flue Exit
Fig. 34
Flushing Tube
Central Heating Return
© Baxi Heating UK Ltd 2007
Supplied By www.heating spares.co Tel. 0161 620 6677
Wall Plate
Fig. 35

10.0 Installation

10.1
Unpacking & Initial Preparation
The gas supply, gas type and pressure must be checked for
suitability before connection (see Section 7.4).
Remove staples, open flaps and remove the cardboard
sheet.
Remove the polystyrene side pieces and literature. Two
people can then lift out the boiler.
NOTE: a small amount of water may drain from the
boiler in the upright position.
1. After considering the site requirements
(see Section 7.0) position the fixing template on the wall
ensuring it is level both horizontally and vertically.
2. Mark the position of the two most suitable fixing slots for
the wall plate and boiler lower fixing holes. It is preferable to
use the vertical fixing slots.
3. Mark the position of the centre of the flue hole (rear
exit). For side flue exit, mark as shown (Fig. 34).
4. If required, mark the position of the gas and water pipes.
Remove the template.
5. Cut the hole for the flue (minimum diameter 116mm).
Fig. 31
6. Drill the wall as previously marked to accept the wall
plugs supplied. Secure the wall plate using the fixing screws.
7. Using a spirit level ensure that the plate is level before
finally tightening the screws.
8. Connect the gas and water pipes to the valves on the
wall plate using the copper tails supplied. Ensure that the
sealing washers are fitted between the connections.
10.2
Flushing
1. Connect a tube to the central heating flow or return pipe
(Fig. 35).
2. Flush thoroughly (see System Details, Section 6.2).
27

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents