Completion - Baxi Platinum 2 Combi 28 GA Installation & Servicing Instructions Manual

Gas fired wall mounted condensing combination boiler
Table of Contents

Advertisement

13.0 Completion

13.1
Completion
1. Replace the case front panel, and secure with the screws
previously removed. Re-fit the i-THINK Controller.
2. This publication must be handed to the user for safe
keeping and each subsequent regular service visit recorded.
3. Set the central heating and hot water temperatures to the
requirements of the user. Instruct the user in the operation of
Case Front Panel
the boiler and system.
4. Instruct the user in the operation of the boiler controls.
Hand over the i-THINK Set Up Guided/User's
Operating/Important Warranty booklet and the Installation &
Servicing Instructions, giving advice on the necessity of regular
servicing.
5. Demonstrate to the user the action required if a gas leak
occurs or is suspected. Show them how to turn off the gas
Facia Panel
supply at the meter control, and advise them not to operate
electric light or power switches, and to ventilate the property.
6. Show the user the location of the system control isolation
switch, and demonstrate its operation.
Fig. 44
7. Advise the user that they may observe a plume of vapour
from the flue terminal, and that it is part of the normal
operation of the boiler.
33
© Baxi Heating UK Ltd 2011

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Platinum 2 combi 33 gaPlatinum 2 combi 40 ga

Table of Contents