Install the drive.
7.
Close and lock the tower bezel.
8.
Connect each power cord to the server.
9.
Connect each power cord to the power source.
10.
Power up the server (on page 16).
11.
Installing a hot-plug drive
CAUTION:
all bays are populated with either a component or a blank.
To install the component:
Remove the tower bezel (on page 17).
1.
Remove the drive blank.
2.
Retain the blank for future use.
3.
To prevent improper cooling and thermal damage, do not operate the server unless
Hardware options installation 30