Anchoring The Wall Sleeve; Installing The Hydronic Heat Section - Daikin IM 1193 Installation & Maintenance Data

Packaged terminal air conditioner 16" x 42" pgan with top-mounted hydronic heat
Table of Contents

Advertisement

Anchoring The Wall Sleeve

7. Anchoring the wall sleeve is accomplished as shown
Figure
13. Use the rubber isolation washers with
in
the fasteners to minimize sound transmission from the
equipment to the wall, at the point of contact. A 5⁄16"
(8mm) hole is provided on each side, 2" (51mm) down
from the top and 2" (51mm) in from the rear of the wall
sleeve. It may be necessary to drill additional holes in
the wall sleeve to firmly secure it.
CAUTION
Do not drill holes in the base of the wall sleeve. Use
shims between the wall and the wall sleeve to prevent
wall sleeve distortion during anchoring.

Installing The Hydronic Heat Section

1. The heat section is designed to be "snapped" into the
top of the wall sleeve
holes provided in the wall sleeve, two on each side, for
coil attachment. To Assemble the heat section to the
wall sleeve:
2. Unpack the heat section and inspect for any shipping
damage. Report any damage found to the carrier.
Check the heat section against the plans to make certain
3.
the coil supplied has the connections that match the
specifications.
Figure 14: Attach hydronic coil blockoff plate
(Figure
15). There are four square
Underside of Hydronic Heat Section
Figure 13: Anchoring the wall sleeve
Rubber
Isolation
Washer
Molly or
Expansion
Toggle Bolt
Anchor Bolt
Do Not Drill Holes in Bottom
of Sleeve
(Except for Internal Drain Kit)
Note: All anchoring hardware field supplied
4. Attach the provided hydronic coil blockoff plate to the
under side of the hydronic heat section with the two (2)
screws as shown in
Figure
5. Firmly attach the heat section to the wall sleeve by
lining up the heat section hooks with the square holes
supplied in the wall sleeve. Snap the heat section in
place by exerting pressure downward. See
WARNING
The hydronic coil blockoff plate must be installed to prevent
discharge air from bypassing the hydronic coil, resulting in loss
of efficiency.
Hydronic Coil Blockoff Plate
Wood
Screw
Cripple Stud
Main Stud
14.
Figure
15.
IM 1193 / Page 11 of 32

Advertisement

Table of Contents
loading

Table of Contents