Attach Radiator And Cover - Joyner JNSZ650DLB Owner's Manual And Parts Manual

Joyner utv owner's manual and parts manual
Table of Contents

Advertisement

Attach radiator and cover

temprature switch
1. Attach the radiator as above figure, tighten all bolts
Note: check all electrical plug connections are good.
Attach radiator and cover
2
03.01.5787-M12X1,5X30/05
1
02.D800.04.02.01
Erp code
2
water outlet hose of engine
1
water inlet hose of engine
2
GB/T5787-1986
bolt M12*1.5*30
D800.04.02.01.00
code name
Description
4
1
radiator
Q'ty

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents