Santana PS-10 Service Manual page 145

Table of Contents

Advertisement

4A-20 FRONT DRIVE SHAFT
6
B
6
7
38
• Set up dial gauge (B) as shown in the figure: fix support to
hub and place dial gauge with the measuring tip touching
the adjusting nut (6).
• Measure the longitudinal play of the hub which must agree
with the specified value; otherwise, tighten or loose adjusting
nut (6) till getting the optimum play.
Longitudinal bushing play:
0.05 ÷ 0.10 mm
• Once obtained the specified longitudinal play, install new
cotter pin (7) and counter nut (38) tightening it to the
C
specified tightening torque using key (C) ref: 161950.
Tightening torque for counter nut fixing bushing:
12 ÷ 14 Kg-m (120 ÷ 140 Nm)
NOTE:
Once applied the final tightening torque to counter
nut (38) check again the longitudinal play which must
remain at the value 0.05 ÷ 0.10 mm.
• Block nuts position bending one wing of the cotter pin (7)
towards counter nut (38) and the other one towards the
adjusting nut (6).
• Ensure that coupling surfaces between flange and hub are
4
clean.
• Apply a coat of the recommended sealant in the coupling
5
surface of the dragging flange (5) and fix it to hub with
screws (4) tightened to the specified tightening torque.
Tightening torque for screws fixing dragging flange:
3.5 ÷ 4.25 Kg-m (35 ÷ 42.5 Nm)

Advertisement

Table of Contents
loading

Table of Contents