Finalizing The Installation; Steps For Finalizing The Installation - Travis Industries GreenSmart 564 SS Installation Manual

Built-in direct vent fireplace
Hide thumbs Also See for GreenSmart 564 SS:
Table of Contents

Advertisement

Finalizing the Installation

Steps for Finalizing the Installation

1.
Remove the glass (see page 45).
NOTE:
If using propane (LP) convert the appliance prior to installing the logs.
2.
We recommend you purge the gas line at this time (with the glass removed). This allows gas to be detected
once it enters the firebox, ensuring gas does not build up.
3.
Make sure the two accent light bulbs are in place.
NOTE: .Take care to not touch the bulb with your fingers – use a cloth or paper towel).
4.
Install the four AA batteries (included in the owner's pack) into battery holder (see the illustration below). The AA
batteries act as a power backup in case the household (AC) power goes out. Install the 9v battery (included in
the owner's pack) into control panel light assembly (see the illustration below). The battery holder is held in place
with Velcro and may be removed for easier access.
5.
Install the logs (see page 47).
© Travis Industries
Lift up and swing the lower grill
down to acces the area below the
firebox.
4090709
(for qualified installers only)
Swing the concealment cover
up and slide it back to expose
the controls.
AA Battery Tray
43
Battery Holder for Control
Panel Lights
AA Battery
Holder
100-01222_000

Advertisement

Table of Contents
loading

This manual is also suitable for:

Greensmart 564 gs

Table of Contents