Daikin Super Multi Plus D-Series Service Manual page 356

Table of Contents

Advertisement

SiEBE18-526
Step
4
Disconnect the HPS
connector and the
electrical box connector
from each other.
5
Remove the TYRAP
fixture and unbind the
leads.
6
Remove the TYRAP
fixture (reactor lead).
7
Remove the screw.
8
Remove the TYRAP
fixture (reactor lead).
9
Remove the two clamps
and disconnect the
compressor lead.
Removal Procedure
Procedure
HPS connector: Red
Electrical box connector: White
Cut off with nippers.
The TYRAP fixture is to be kept
in stock.
(Q0483)
Cut off with nippers.
(Q0484)
Cut off with nippers.
(Q0485)
Outdoor Unit
Points
345

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents