Optional Equipment
LP Conversion Instructions
Install the conversion kit prior to installing the gas line to ensure proper gas use.
1
Remove the face and glass (see page 19-20). Remove the logs and coals (if installed - page 22)
2
Remove the burner (see illustration below).
b
Lift up on the left
side of the burner,
then slide the
burner to the left
and up to remove.
Burner Replacement:
Make sure the screw
on the bottom of the
burner inserts into this
hole.
Make sure the burner is fully seated and pilot hood lines up with the
burner holes at the rear edge of theburner.
Travis Industries
The mixing tube slides onto
the orifice.
1 0 0 - 0 1 1 5 5
(for qualified installers only)
a
Lift the pilot hood off
the pilot assembly (you
may need to pull hard
to remove).
After replacing the burner
re-attach the pilot hood.
Before replacing the burner,
slide the air control all the
way to the right.
3 7
4 0 4 0 9 0 3