Chevrolet Light Operator's Manual page 52

1952 trucks
Hide thumbs Also See for Light:
Table of Contents

Advertisement

7. Repeat above operations at each wheel.
Manual Bleeding (Except
1
%: and 2
Ton)
1. Clean all
dirt from top of main cylinder and remove filler
plug.
2. Install adapter and automatic filler J
-713.
3.
Follow bleeding operations
as
outlined in Steps
3
th~ough
7 under "Pressure Bleeding."
Pressure Bleeding
(Ph and
2
Ton)
To bleed the hydraulic system on
1
%: and 2 ton trucks a
pressure bleeder tank should be used and in accordance with
the following procedure:
1. Back off adjustment all the way on the upper shoe on both
rear wheels.
2. Remove filler cap from main cylinder and fill the
reservoir
to the top of filler plug opening.
3. Connect pressure bleeder to main cylinder and open valve
in
the bleeder tank line.
NOTE:
The
bleeder tank should be
pumped
up to 20 pounds pres-
sure and
kept
at approximately this
pressure during the bleeding
operation.
The
enct of
the bleeder tube must be in
a bleeder
jar
or
bottle IUld covered with fluid while performing all
bleeding
opera-
tions.
4. Connect bleeder tube to hydrovac slave cylinder, open
bleeder valve and bleed until all air bubbles disappear. Close
bleeder valve.
5. Connect
bleeder
tube to hydrovac valve bleeder valve,
open bleeder valve and bleed until all air bubbles disappear.
Clo~
bleeder
valve.
6. Connect bleeder tube
to
the rear, rear wheel cylinder on
.,..

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Heavy dutyMediumTruck 1952

Table of Contents