Commissioning Report - Potterton Paramount two Installation, Operation & Maintenance Manual

Wall hung condensing boiler 30 – 115kw
Table of Contents

Advertisement

Commissioning report

11. Commissioning report
Wood Lane, Erdington
Birmingham B24 9QP
Telephone 08706 050607 Fax 08706 001516
REPORT No: ..........................................................
SITE ADDRESS: ...................................................
................................................................................
................................................................................
................................................................................
................................................................................
1.0
BOILER
1.1
Type:
1.2
No of Sections:
Boiler
1.3
No/Position:
1.4
Serial No:
1.5
Fuel:
N/Gas
2.0
BURNER
2.1
Type:
Standard
Flame
2.2
Detection
Probe:
2.3*
Control Box Type:
2.4
Electrical Supply:
2.5
Main Gas Valve Type & Size:
2.6
Pilot Gas Valve Type & Size:
2.7
Gas Train Serial Number:
3.0
BURNER SETTINGS
3.1
Main Burner Injector Size:
3.2
Pilot Burner Injector Size:
3.3
Are Burners & Injectors Clean?:
3.4
Kanthal Bars Fitted? (Modified & Ultimate only):
3.5*
Is the Probe of the Correct Type?
3.6
Electrode Settings as Manual?
4.0
PRE-COMMISSIONING CHECKS (See Note)
4.1
Is boiler house ventilation as per manual?
Electric supply fused, isolated & earth wire
4.2
attached?
4.3
Check external controls allow operation
Check boiler/system flooded and pumps
4.4
operational and any isolation valves open
4.5
Check gas available at burner
Check condensate trap fitted, filled and
4.6c
connected to drain with air break
4.7
Check gas meter sizing adequate
4.8
Check flue system clear
NOTE: It is the installer's responsibility to ensure that the boiler is correctly commissioned by a competent engineer and that this report is completed
and kept as a record. A commissioning service available from Potterton at the address listed on the back page of this manual. When a Potterton
engineer commissions, this completed report will be sent to the installer. It is the installers responsibility to action any points arising. Commissioning
by Potterton engineers is restricted to equipment of our supply. No responsibility is accepted for the on site assembly or installation of the equipment
unless specifically carried out by Potterton. The installer must ensure that the boiler is installed in accordance with the manufacturer's instructions
and all relevant BS Codes of Practice and Regulations (see manufacturers instructions for full details). Items 4.1 to 4.6 are related to the boiler
installation and as such these pre-commissioning checks should be carried out in the presence of the installer.
Potterton is a Member of the Boiler & Radiator Manufacturers Association (BARMA), and the terms of this Commissioning Document follow the
generally agreed conditions of the Association. Potterton, in line with its policy of continuous product development, reserves the right to alter and
amend this Document as is deemed necessary at any time.
76
RH
LH
Centre
LPG
Low NOx
Ultimate
UV Cell
Thermocouple
REPORT SENT TO
INSTALLER:
SITE VISIT
Date:.......................................................................
Signature: ..............................................................
INSTALLER NAME & ADDRESS:..........................
...............................................................................
...............................................................................
...............................................................................
...............................................................................
VISIT/COMMISSIONING DATE: ...........................
5.0
COMBUSTION
5.1
Gas rate
Main Burner
5.2
Pressure
Pilot Burner
5.3
Pressure
Ionisation Probe/UV
5.4*
Cell Current
5.5c
Air Shutter Position
5.6
CO2 or O2
5.7
CO
Gross Flue Gas
5.8
Temperature
5.9
Ambient Temperature
5.10
Flue Draught
Inlet Gas Pressure (Main Burner). If
5.11
multi-boiler installation, inlet gas
pressure all boilers high fire)
NOTE: 5.5 to 5.9 TO BE MEASURED IN SECONDARY
mm
FLUE 600mm UP FROM THE FLUE SOCKET OR AT
mm
THE SAMPLING POINT PROVIDED (CONDENSING
BOILERS ONLY).
INTENDED AS SAFETY CHECKS ONLY.
ARE DEPENDENT ON FLUE DRAUGHT AND SITE
CONDITIONS AND HENCE CANNOT BE USED FOR
COMBUSTION EFFICIENCY DETERMINATION.
*
FULLY ELECTRIC BOILERS ONLY
THERMO-ELECTRIC BOILERS ONLY
c
CONDENSING BOILERS ONLY
§
CONVENTIONAL ATMOSPHERIC BOILERS ONLY
YES
COMMISSIONING
Pilot
Low
High
THESE MEASUREMENTS ARE
POTTERTON COMMERCIAL
NO
Unit
m³/hr
mmwg
mmwg
uA
-
%
ppm
°C
°C
mmwg
mmwg
LEVELS

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents