Programming

8.
Programming
8.1

Programming procedure

Fig. 11: Selection of setting levels and menu points
Boiler temperature
Press
Information button
Press for approximately 3 s, until the display End User appears.
Select programming level
Setting levels:
Enduser (E)
Commissioning (I)
incl. enduser (E)
Engineer (F)
incl. enduser (E) and commissioning (F)
OEM
includes all other setting levels and is protected
by a password.
Not all menu points are visible, depending on the selection of setting level and programming!
36
The controller must be programmed after installation.
The selection of the setting levels and menu points for end users
and heating specialists is carried out by means of the following di-
agram:
Basic display
Menu points:
Time and date
Operator section
Time prog heating circuit 1
Time prog heating circuit 2
Time program 3/HCP
Time program 4/DHW
Holidays heating circuit 1
Holidays heating circuit 2
Heating circuit 1
Heating circuit 2
Domestic hot water
Boiler
Solar
Buffer storage tank
DHW storage tank
Direct DHW charging
Configuration
LPB
Fault
Maintenance/Service
State
Diagnostics heat generation
Diagnostics consumers