Notes For Installation Location; Clearances - Potterton Paramount two Installation, Operation & Maintenance Manual

Wall hung condensing boiler 30 – 115kw
Table of Contents

Advertisement

Before installation
4.5

Notes for installation location

4.6

Clearances

18
Attention! When first installing the PARAMOUNT two for heating
operation or in connection with a DHW storage, the following has
to be observed:
In order to prevent damage to the boiler due to water quality, par-
ticularly due to leakages in the tank, suitable precautionary
measures should be taken regarding installation.
Installation room
• The installation room must be dry, the room temperature must
be between 0 and 40°C.
The installation location has to be selected, especially, with re-
spect to ducting of the flue. When installing the boiler, the speci-
fied clearances have to be maintained.
Sufficient space should exist in the front to carry out inspection
and maintenance work.
When installing the PARAMOUNT two , the following clearances
must be considered:
FRONT - access for maintenance
SIDES - minimum 20 mm
TOP - access for flue connection
POTTERTON COMMERCIAL

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents