Servicing; Maintenance Work; Replace Air-Vent; Condensate Siphon - Potterton Paramount two Installation, Operation & Maintenance Manual

Wall hung condensing boiler 30 – 115kw
Table of Contents

Advertisement

Servicing

10. Servicing

10.1 Maintenance work

10.2 Replace air-vent

10.3 Condensate siphon

62
Danger of electric shock! Before removing parts of the cover, the
boiler has to be deenrgised.
Work under voltage (removed cover) must only be carried out by
an electrician!
Cleaning of heating surfaces and burner should be carried out by
approved gas installer. Before beginning the work, the gas shut-off
device and the shut off valves of the hot water should be closed.
Maintenance work includes among others:
– PARAMOUNT two Clean SOB outside.
– Check connection and seal locations of water filled parts.
– Check safety valves for correct function.
– Check operating pressure and, possibly, fill in water.
– De-aerate heating plant and return gravity lock into operating
position.
It is recommended to carry out maintenance and cleaning of the
PARAMOUNT two annually.
The burner has to be checked for contamination and, possibly, to
be cleaned and serviced.
Die Abgassammelschale auf Ablagerungen überprüfen (Reinigungs-
öffnung).
A defective air-vent must only be replaced with an original spare
part; this guarantees an optimum de-aering!
Caution!The boiler water has to be drained before dismantling of
the quick-de-aerator, as otherwise water will leak out!
The condensate syphon should be cleaned every one to two years.
For this, loosen the upper screw connection at the siphon and pull
the siphon downwards. Remove the siphon complete with hose out
of the boiler, dismantle and rinse with clean water. Assemble the
siphon in reverse order.
At the same time, the flue gas collecting sump should be checked
for soiling and if needed should be cleaned (rinsed).