Unit Configuration Type An; Unit Configuration Type Ak; Unit Configuration Type Ap - Daikin AVS Installation Manual

Classroom unit ventilators
Table of Contents

Advertisement

Louver Installation With Typical Unit Configurations

Unit Configuration Type AN

Note:
Arrangement AB with full metal back panel, similar to
configuration type AN. (Outside air opening to be cut
and sealed by others.)
" (556mm) Deep Full Adapter Back Unit With
7
Figure 13 - 21
8
Standard Louver Application
Lintel
(By Others)
Louver
Sealed Cement
Mortar;
Pitch Away
From Unit

Unit Configuration Type AP

Figure 15 – The 21
" (556mm) Deep Full Adapter Back Unit with
7
/
8
Closed Pipe Tunnel, Ducted with Top Intake
Window Sash
Intake Louver
Important: Gasket sealing surface is required.
IM 817-4
Piping
Piping
1"
(25mm)
Floor Line
Important: Gasket sealing
surface is required.
"Goose Neck"
Insulated Duct (By Others)
Duct Collar (By AAF)
Piping
Piping
Floor Line
" (556mm) Deep Full Adapter Back Unit with High
7
Figure 14 - 21
8
Louver Application
Lintel (By Others)
Louver
Sealed Cement
Mortar;
Pitch Away From Unit
Not More
Than 28"(711mm)

Unit Configuration Type AK

Figure 16 – 21
" (556mm) Deep Partial Adapter Back Unit with Open
7
/
8
Pipe Tunnel
Lintel
(By Others)
Intake Louver
Not More
Than 12"
Sealed Cement
Mortar;
Pitch Away
From Unit
Piping
Piping
Floor Line
Important: Gasket sealing
surface is required.
Gasket Seal
Piping
Piping
1"
Floor Line
(25mm)
Important: Gasket sealing
surface is required.
Page 9 of 60