Deck Leveling Adjustment; Deck Lift Spring - Ferris IS2000Z Diesel Operator's Manual

Is2000z diesel series zero-turn riding mower
Hide thumbs Also See for IS2000Z Diesel:
Table of Contents

Advertisement

DECK LEVELING ADJUSTMENT

NOTE: Before adjusting the deck level, the deck lift
rod timing must be checked and/or adjusted.
1. Park machine on a flat, level surface. Disengage
the PTO, stop the engine and engage the parking
brake. Rear tires must be inflated to 15 psi (1,03
bar); front tires to 25 psi (1,72 bar).
2. Lock the deck lift pedal in the 5" (12,7cm) position.
Place the deck height adjustment pin in the 4"
position and lower deck the lift pedal until the arm
contacts the pin.
3. Place 2 x 4 blocks under each corner of the
mower deck with the 3-1/2" sides being vertical.
Place a 1/4" (0,64cm) thick spacer on top of the
rear 2 x 4 blocks. See Figure 52.
4. Adjust the front eyebolts until the chains are tight
and the deck is still resting on the 2 x 4's. Tighten
jam nuts. See Figure 53.
5. Loosen the nuts and allow the rear of the deck to
rest on the 2 x 4's and 1/4" spacers. Slide the
chains down in the slots until the chains are tight
and tighten the nuts. See Figure 53.
6. Remove all 2 x 4 blocks and spacers from under
the mower deck.

DECK LIFT SPRING

The deck lift springs (A, Figure 54) are factory set to
provide optimal lifting performance.
Although it is fastened with a multi-position anchor,
this is NOT AN ADJUSTMENT POINT.
DO NOT attempt to adjust the spring length or lifting
performance will be compromised.
Troubleshooting, Adjustment & Service
Figure 52. 2 x 4 Locations (Arrow points toward
front of the deck)
A
Figure 53. Hanger Chain Adjustment
A. Adjustment Points
A
Figure 54. Deck Lift Spring Location
A. Deck Lift Spring
A
47

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Is2000zy20d48Is2000zy20d48rIs2000zy20d52Is2000zy20d52r

Table of Contents