Master Device Installation; Installing Plug-In Box - Zte ZXR10 8900 Series Hardware Installation Manual

Zxr10 8900 series 10 gigabit routing switch
Hide thumbs Also See for ZXR10 8900 Series:
Table of Contents

Advertisement

5
C h a p t e r
Master Device
Installation
Table of Contents

Installing Plug-in Box .........................................................65

Plugging and Unplugging Card.............................................67
Installation of Power Supply Module .....................................70
Installation of Fan Plug-in Box .............................................76
Installation of Cabling Rack.................................................79
Installing Plug-in Box
The plug-in boxes are already installed inside the cabinets in fac-
tory. If the plug-in boxes are required to install under special con-
dition, such as changing the damaged plug-in boxes, perform the
following steps.
1. Make sure 19D8H20/19D6H20 has been fixed well. The in-
stallation position of cases has been confirmed. There is no
obstacle to affect the cast installation.
2. Use a wood ruler or bar with the same height as that of the
plug-in box. Put wood ruler behind plug-in box flange to be
flush with the box bottom. Mark the ruler with a pencil through
the flange installation holes.
3. Put up the end of the marked ruler on support rails of the cab-
inet.
4. Install flexible floating nut on the front corner rail of the cabinet
with installation spring as per the marked positions, as shown
in
Figure
60.
Confidential and Proprietary Information of ZTE CORPORATION
65

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Zxr10 8912Zxr10 8908Zxr10 8905Zxr10 8902

Table of Contents