Figure 44 Reinstallation The Angle Support; Figure 45 Connection Between Two Near Cabinets - Zte ZXR10 8900 Series Hardware Installation Manual

Zxr10 8900 series 10 gigabit routing switch
Hide thumbs Also See for ZXR10 8900 Series:
Table of Contents

Advertisement

ZXR10 8900 Series Hardware Installation Manual
F
44 R
IGURE
EINSTALLATION THE
F
45 C
IGURE
ONNECTION
1.
Six screws M8×12
2.
Spring washer
3.
Flat washer
50
Confidential and Proprietary Information of ZTE CORPORATION
A
S
NGLE
UPPORT
4. Between two near cabinets, use six screws M8×12, flat washer,
spring washer and M8 nut to connect angle support. The in-
stallation of two near cabinets is shown in
B
T
N
C
ETWEEN
WO
EAR
4.
Angle support
5.
M8 nut
5. After connecting the cabinets, fix the cabinet. If the cabinet is
installed by an adjustable base, press the footing with pressure
plate. Fix the pressure plate on adjustable base with M12×30
screws. As a result, the footings are fixed. If the cabinet is
installed on floor directly, press the footing with pressure plate,
and fix the pressure plate on expansion bolt on floor. As a
result, the cabinet is fixed.
6. Install cabinets orderly according to step 5. Fix all footings.
7. Inspect the support condition of each footing.
Result: The cabinets have been connected.
ABINETS
Figure
45.

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Zxr10 8912Zxr10 8908Zxr10 8905Zxr10 8902

Table of Contents