Heat & Glo SL-550METRO-BU Owner's Manual page 25

Table of Contents

Advertisement

V Minimum
1 ft.
305 mm
1 ft.
1-1/2 ft.
457 mm
2 ft.
2-1/2 ft.
762 mm
4 ft.
3-1/2 ft.
1.1 m
6 ft.
4-1/2 ft.
1.4 m
14 ft.
H
+ H
MAX. =14 ft. (4.3 m)
1
2
V + H + H
MAX. = 40 ft. (12.2 m)
1
Figure 7.5
Heat & Glo • SL-550METRO, SL-550METRO-LP, SL-550METRO-BU • 2185-900 Rev. Q • 8/12
Top Vent - Horizontal Termination
Venting with two 90º elbows
H
+ H
Maximum
1
2
SL-550METRO
305 mm
610 mm
1.2 m
1.8 m
4.3 m
H
2
INSTALLED
HORIZONTALLY
Note: Use SLP Series
components only.
Note: There MUST be a 25%
reduction in total H when using
fl ex vent except when using the
simple up and out installation
(see Figure 7.3).
WARNING
Fire Risk.
• A one foot minimum vertical vent section
is required before installing fi rst elbow.
H
1
V
1
25

Advertisement

Table of Contents
loading

This manual is also suitable for:

Sl-550metroSl-550metro-lp

Table of Contents