GENERAL

When installing, operating and maintaining your
Erin Stove respect basic standards of fire safety.
Read these instructions carefully before commenc-
ing the installation. Failure to do so may result in
damage to persons and property. consult your local
Municipal office and your insurance representative
to determine what regulations are in force. Save
these instructions for future reference.
Please note that it is a legal requirement under
England & Wales Building Regulations that the
installation of the stove is either carried out under
Local Authority Building Control approval or is
installed by a Competent Person registered with a
Government
approved
Scheme. HETAS Ltd operate such a scheme and a
listing of their Registered Competent Persons can
be found on their website at www.hetas.co.uk.
Special care must be taken when installing the stove
such that the requirements of the Health & Safety at
Work Act are met.

Handling

Adequate facilities must be available for loading,
unloading and site handling.

Fire Cement

Some types of fire cement are caustic and should
not be allowed to come into contact with the skin. In
case of contact with the skin wash immediately with
plenty of water.

Asbestos

This stove contains no asbestos. If there is a possi-
bility of disturbing any asbestos in the course of
installation then please seek specialist guidance and
use appropriate protective equipment.

Metal Parts

When installing or servicing this stove care should
be taken to avoid the possibility of personal injury.
"IMPORTANT WARNING"
This stove must not be installed into a chimney that
serves any other heating appliance.
There must not be an extractor fan fitted in the same
room as the stove as this can cause the stove to
emit fumes into the room.
THE ERIN SOLID FUEL CENTRAL HEATING STOVE
INSTALLATION & OPERATING INSTRUCTIONS
Competent
Persons
The complete installation must be done in accor-
dance with current Standards and Local Codes. It
should be noted that the requirements and these
publications may be superseded during the life of
this manual.
PRE INSTALLATION ASSEMBLY
(A) After removing the stove from its pack, open the
ashpit door and remove the contents.
(B) Open the firedoor and remove the contents from
the firebox.
(C) Remove loose fitting hob and place on
a non abrasive surface.
(D) Remove position stops form the pallet making
sure that any nails that may damage the stove
are removed or hammered below the surface
using hammer and punch. (See Fig.1)
Fig.1
(E) Manover the stove so that it overlaps the pallet
by no more than 80mm.
(F) Remove the two transport screws from the front
leg positions and fit the legs using the M10 x
20mm hex head bolts. See Fig. 2 & 3.
Fig.2