AMT Datasouth Accel-7350 Service Manual page 63

24 pin serial dot matrix printer
Hide thumbs Also See for Accel-7350:
Table of Contents

Advertisement

Step5: Remove the "E" rings from inside of the F guide shaft, remove the bearings.
Step6: Remove carrier cover screws, and cover.
Step7: Remove the two print head screws and detach the print head FFC- A, B and C cables.
Step8: Remove the 4 captive screws that are holding the C motor to the fixing plate, then
remove the timing belt from the C motor pulley. Remove the screws that are holding the rear
guide to the base plate L and the base plate R. Remove the rear guide.
Step9: Remove the timing belt from the idler pulley assembly by dislocating the idler pulley
assembly from its holder.
62

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents