Optional Brick Kit Installation - Jøtul GF 400 DV Sebago Installation And Operation Instructions Manual

Direct vent gas stove
Table of Contents

Advertisement

Optional Antique Brick
Panel Kit 155375
Tools Required: Safety glasses and gloves
1. Remove the Top Plate. Simply lift if up off of the
stove body. It is not fastened.
2. Remove the Glass Frame. Disengage the two com-
pression latches located at the top of the firebox
and lift the glass frame up and off of the stove. See
Fig. 49.
3. Remove the Logset.
These parts are not fastened. Simply lift them out of
the firebox. You do not have to remove the embers.
4. Install the Rear Panel.
Tilt the Rear Panel top first to slide behind the ex-
haust baffle and position it up against the back wall.
See Fig. 50.
5. Install the Side Panels. Tilt each panel, bottom edge
first, into position against the side walls. The panels
will stand on their own against the wall. Push them
back against the Rear Panel. Fig. 51.
6. Reinstall the Logset.
See page 21. BE CERTAIN THAT NO EMBERS ARE
BLOCKING THE PILOT ASSEMBLY OPENING.
7. Replace the Glass Frame.
Slide the frame down the slot in the front of the
firebox. Be sure to push the frame into the slot in
the bottom to ensure it is fully seated. The gasket at
the top of the frame should be flush with the top of
the firebox.
Pull the compression latches out to engage with the
top lip of the glass frame.
8. Replace the Top Plate.
Left Panel 220601
Rear Panel 220599
Figure 48. Brick Kit Contents
Figure 49. Release the glass frame latches.
Exhaust Baffle
Figure 50. Install the Rear Panel to fit behind baffle.
Figure 51. Install the Side Panels.
137750_Rev_L 7.29.10
Right Panel
220600
Glass Frame
Latch
27

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents