Insert Finishing; Flashing Installation; Trivet Installation - Napoleon NPS45 Installation And Operating Instructions Manual

Pellet stove heater/pellet insert heater
Table of Contents

Advertisement

7.0 INSERT FINIShING

7.1

FLAShING INSTALLATION

7.1.1
Secure the Right Flashing to the
right side of the heater using two
of the #8 x 1/2" screws.
NOTE: Feed the Air Control Rod into
the Air Control Slot on the Right
Flashing before securing.
7.1.2
Twist spring handle (supplied
with the heater) onto the air
control rod until it hits the stop.
7.1.3
Remove the two control panel
securing screws, discard the screws
and shipping bracket.
7.1.4
Secure the control panel to the right
Flashing using the two #8 x 3/8" screws.
Secure the Left Flashing with the
remaining #8 x 1/2" screws.
7.1.5
Align the holes in the top of the right
and left Flashing with those on the
bottom lip of the Top Flashing and
secure from the rear using the four
#8-32 x 3/8" screws, washers and nuts.
7.1.6
The three pieces of trim are assembled in
the same manner as a picture frame. Place
the corner brackets (with screw loosened)
into the trim sections. Tighten the screw
spreading the two pieces apart. Attach the
adjoining section. Repeat with the opposite
side. Tighten all screws firmly.
7.1.7
Slide the assembled trim down over the flashing.
7.1.8
Affix the logo to the bottom left hand corner of the left flashing.
7.2

TRIvET INSTALLATION

The trivet for the insert is attached by two set screws on the inside of the hopper lid.
fIGure 7.1.1
AIR CONTROL
ROD
AIR CONTROL
SLOT
BURN
RATE LABEL
fIGure 7.1.4
TRIM
UNDERSIDE
fIGure 7.1.3
fIGure 7.2
SHIPPING
BRACKET
CONTROL
SECURING
PANEL
SCREWS
RIGHT
FLASHING
CORNER
BRACKET
SET
SCREW
TP - FlAShING INSTAllATION_PEllET
TP - TRIvET INSTAllATION_PEllET
27
CONTROL
PANEL
SECURING
SCREWS
fIGure 7.1.3
fIGure 7.1.5
TOP
FLASHING
fIGure 7.1.7
TRIM
ASSEMBLY
SET SCREW
W415-0702 / 10.30.08

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Npi45

Table of Contents