Furuno CSH-8L Installation Manual page 63

Color scanning sonar
Hide thumbs Also See for CSH-8L:
Table of Contents

Advertisement

5. Pass the main shaft through the main body flange and assemble the hull unit. Refer to
Chapter 1 for the assembling procedure.
6. Clean the top of the main shaft with alcohol, install the waterproofing attachment and
apply Lock-tight (supplied) to the lock-screw.
Waterproofing
attachment
• Tighten the M6 socket-set screws with a torque of 3.92 to 4.9 N·m.
• Refer to page 1-6 for installing the waterproof attachment.
7. Assemble the hull unit, taking the following points into account:
1)
The shaft retainer should be in contact with the waterproofing attachment.
2)
The fastening band should not be used on the main shaft when it is fitted with the
waterproofing attachment.
3)
When the main shaft is installed without cutting position the shaft retainer as
below.
Clean with alcohole
30 mm
and apply Lock-tight.
As shown on page AP-5,
length is cut length + 45 mm.
APPENDIX
Shaft
AP-3

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents