Installation Procedures; Start Installation - Toyotomi GAN-A135GVR-T3 Service Manual

Table of Contents

Advertisement

Start installation

Preparation before installation
Read the requirements
for electric connection
Select indoor unit
installation location
Install wall-mounting
frame, drill wall holes
Connect pipes of indoor
unit and drainage pipe
Connect wires of indoor unit
Bind up pipes and
hang the indoor unit
Make the bound pipes pass
through the wall hole and then
connect outdoor unit
Neaten the pipes
Vacuum pumping and leakage detection
Check after installation and test operation
Finish installation
Note: this flow is only for reference; please find the more detailed installation steps in this section.
select installation
Prepare tools
location
Select outdoor unit
installation location
Install the support of outdoor unit
(select it according to the actual situation)
Fix outdoor unit
Install drainage joint of outdoor unit
(only for cooling and heating unit)
Connect pipes of outdoor unit
Connect wires of outdoor unit

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents