Vertical Penetration Framing - Heat & Glo SL-750TRS-IPI-E Owner's Manual

Heat & glo direct vent gas appliance heater
Hide thumbs Also See for SL-750TRS-IPI-E:
Table of Contents

Advertisement

C. Vertical Penetration Framing
A ceiling fi restop MUST be used between
fl oors and attics.
• DVP pipe only - Frame an opening 10 in.
by 10 in. (254 mm by 254 mm) whenever
the vent penetrates a ceiling/fl oor (see
Figure 6.3).
• SLP pipe only - Frame opening 9 in. x 9
in. (229 mm x 229 mm) whenever the vent
penetrates a ceiling/fl oor (see Figure 6.3).
• Frame the area with the same sized lumber
as used in ceiling/fl oor joist.
• The ceiling fi restop may be installed above or
below the ceiling joists when installed with a
attic insulation shield. It must be under joists
between fl oors that are not insulated. Refer
to Figure 6.4.
• Secure with three fasteners on each side.
WARNING! Risk of Fire! DO NOT pack insu-
lation around the vent. Insulation must be kept
back from the pipe to prevent overheating.
28
Heat & Glo • SL-750TRS-IPI-E, SL-550TRS-IPI-E, SL-350TRS-IPI • 2120-901 Rev. F • 9/08
Figure 6.3
INSTALL ATTIC INSULATION SHIELDS
BEFORE OR AFTER INSTALLATION OF VENT SYSTEM
CEILING FIRESTOP
INSTALLED BELOW CEILING
Figure 6.4 Installing the Attic Shield
ATTIC ABOVE
A
PIPE
A
DVP
10 in. (254 mm)
SLP
9 in. (229 mm)
3 FASTENERS
PER SIDE
CEILING FIRESTOP
INSTALLED ABOVE CEILING
A

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Sl-550trs-ipi-eSl-550trs-eSl-350trs-ipiSl-750trs-e

Table of Contents