Sym ATTILA RS-21 EFi 150 Service Manual page 10

Table of Contents

Advertisement

¡ E Lubricate the rotation face with specified
lubricant on the lubrication points before
assembling.
¡ E Check if positions and operation for installed
parts is in correct and properly.
¡ E Make sure service safety each other when
conducting by two persons.
¡ E Note that do not let parts fall down.
This chapter Contents
1. General Information/Trouble Diagnosis
¡ E Before battery removal operation, it has to
remove the battery negative (-) cable firstly.
Notre tools like open-end wrench do not
contact with body to prevent from circuit short
and create spark.
¡ E After service completed, make sure all
connection points is secured.
Battery positive (+) cable should be connected
firstly.
And the two posts of battery have to be
greased after connected the cables.
¡ E Make sure that the battery post caps are
located in properly after the battery posts had
been serviced.
¡ E If fuse burned, it has to find out the cause and
solved it. And then replace with specified
capacity fuse.
capacity
verification
1-5

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents