Flue System Approvals And Installation - Heat & Glo ST-HVBI-AU Installation And Operation Instructions Manual

Fireplaces
Table of Contents

Advertisement

1.3 Flue Sytem Approvals and Installation
A. Flue System Approvals
These models are approved to use DVP series direct flue
pipe components and terminations (see Figures 5 and 6).
Approved flue system components are labeled for identifi-
cation. This pipe is tested and listed as an approved com-
ponent of the heater. The pipe is tested to be run inside an
enclosed wall. There is no requirement for inspection open-
ings at each joint within the wall. There is no required pitch
for horizontal flue runs. NO OTHER FLUEING SYSTEMS
OR COMPONENTS MAY BE USED.
Detailed installation instructions are included with each flue
termination kit and should be used in conjunction with this
Installers Guide.
The flame and ember appearance may vary based on the
type of fuel burned and the flueing configuration used.
VERTICAL
TERMINATION
HORIZONTAL
TERMINATION
Terminations Kits
DVP-TRAP
SERIES
Figure 6.
Flue System Components and Termination Kits
WALL FIRESTOP
90 DEGREE
ELBOW
DVP-TVHW
Heat & Glo • ST-HVBI-AU • 2082-900 Rev. C • 8/06
Identifying Flue Components
The flue systems installed on this gas heater may include
one, two, or three 90° elbow assemblies. The relationships
of vertical rise to horizontal run in flue configurations using
90° elbows MUST BE strictly adhered to. The rise to run
relationships are shown in the flueing drawings and tables.
Refer to the diagrams on the next several pages.
This model has a 45
tioned to flue either horizontal or vertical. Depending on the
installation, decide which direction the elbow should be fac-
ing. Remove the 8 screws from the corner cover plate. Po-
0
sition the 45
elbow as desired and replace the corner cov-
er plate with the 8 screws.
STORM COLLAR
ROOF FLASHING
CEILING
FIRESTOP
0
elbow included with it. It may be posi-
PIPE LENGTH
9

Advertisement

Table of Contents
loading

Table of Contents