Carrier Series 100 Installation, Start-Up, And Operating Instructions Manual page 57

Sizes 040-140, series 100 deluxe 4–way multipoise fixed-capacity condensing gas furnace
Hide thumbs Also See for Series 100:
Table of Contents

Advertisement

LOAD CALCULATION
____________
Heating Load (Btuh)
____________
Cooling Load (Btuh)
____________
Furnace Model Selection
COMBUSTION AIR AND VENT PIPING
Termination Location
________
Roof or Sidewall
________
Termination Kit — 2 Pipe or Concentric
________
Combustion-Air Pipe Length
________
Combustion-Air Pipe Elbow Quantity
________
Vent Pipe Length
________
Vent Pipe Elbow Quantity
________
Pipe Diameter Determined from Sizing Table
________
Pipe Sloped To Furnace
Pipe Insulation
________
Over Ceilings
________
Low-Ambient Exposed Pipes
CHECKLIST—DIRECT VENT (2-PIPE) INSTALLATION
57
Condensate Drain
________
Unit Level or Pitched Forward
Internal Tubing Connections Free of Kinks
________
and Traps
External Drain Connection Leak Tight and
________
Sloped
________
Condensate Trap Primed before Start-Up
________
Heat Tape Installed if Required
CHECKLIST—START-UP
Gas Input Rate
________
(Set Within 2 percent of Rating Plate)
________
Temperature Rise Adjusted
Thermostat Anticipator
________
Anticipator Setting Adjusted or
________
Cycle Rate (3 Cycles per Hr) Selected
Safety Controls Check Operation
________
Primary Limit
________
Pressure Switch

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents