Building-in
1. Make the cut-out in the work surface. Ensure
that there is sufficient space allowed at the
sides and at the rear.
2. Attach the sealing strip to the underside of
the hob and the aeration profile.
3.* Connect the pressure regulator supplied at
the angle-joint, ensuring that they are
positioned correctly. (See also
"Gas Connection".)
4. Place the hob in the cut-out. Check that the
air inlets at the back of the hob are clear.
5. Secure the hob in position. The brackets
clamp underneath the work surface.
6. Make the gas connection. Check the gas
connections with a soapy solution.
7. Put the plug in the socket (see "Electrical
Connection").
8. Test to check that the hob is operational.
* Undertray is positioned on work surface.
glass shield
sealing tape
worktop
wooden block
burner box
17