Section 3: Installing The Fireplace; Step 1 Locating The Fireplace; Step 2 Framing The Fireplace - Heat & Glo EVEREST EVEREST Installer's Manual

Heat & glo lifestyle indoor fireplace user manual
Table of Contents

Advertisement

3
Installing the Fireplace
Step 1.
Locating the Fireplace
The diagram below shows space and clearance require-
ments for locating a fireplace within a room.
4" (102mm)
A
A
B
35 1/2"
21 3/4"
(902mm)
(552mm) (775mm) (1099mm) (1554mm)
Figure 2.
Fireplace Dimensions, Locations,
and Space Requirements
Clearance Requirements
The top, back, and sides of the fireplace are defined by
stand-offs. The minimum clearance to a perpendicular wall
extending past the face of the fireplace is 4 inches (102mm).
The back of the fireplace may be recessed 23 (584mm)
inches (546mm) into combustible construction.
Minimum Clearances
from the Fireplace to Combustible Materials
Glass Front ........................ 36 .............. 914
Floor
............................ 0 ................. 0
Rear
........................... 1/2 ............... 13
Sides
........................... 1/2 ............... 13
Top
......................... 4 1/2 ............ 114
Ceiling*
........................... 31 .............. 787
* The clearance to the ceiling is measured from the
top of the unit, excluding the stand-offs and collar.
See Figure 24 for further details.
B
E
1/2" (13mm)
C
D
30 1/2"
43 1/4"
61 3/16"
Inches
mm
Heat & Glo • Everest • 750-900 Rev. L • 1/06
from the Vent Pipe to Combustible Materials
Vertical Sections. ............. 1 ................ 25
Horizontal Sections
Top ..................................... 3 ................ 75
Bottom ............................... 1 ................ 25
Sides ................................. 1 ................ 25
At Wall Firestops
Top ..................................... 3 ................ 76
Bottom ............................... 1 ................ 25
Sides ................................. 1 ................ 25
For minimum clearances, see the direct vent termination
clearance diagrams on pages 20 and 21 in this manual.
The distance from the unit to combustible construction
is to be measured from the unit outer wrap surface to
the combustible construction, NOT from the screw
heads that secure the unit together.
Step 2. Framing the Fireplace
Fireplace framing can be built before or after the fireplace is
set in place. Framing should be positioned to accommo-
date wall coverings and fireplace facing material. The dia-
D
gram below shows framing reference dimensions.
CAUTION: MEASURE FIREPLACE DIMENSIONS, AND
VERIFY FRAMING METHODS AND WALL COVERING
C
DETAILS, BEFORE FRAMING.
E
Framing should be
constructed of 2 X 4
lumber or heavier.
A. ..... 35 1/8" (892mm)
B. ..... 50 1/2" (1283mm)
C. ..... 21 3/8" (542mm)
D. ..... 55 1/2" (1372mm)
(Center of 12 x 10)
Figure 3.
Minimum Clearances
Inches
Shows center of
10" x 12" vent framing
holes for venting.
D
B
A
Framing Dimensions
mm
C
9