Flue Termination - Heat & Glo LCOR-HVB-CE Installer's Manual

Hearth and home technologies gas fireplace installation guide
Hide thumbs Also See for LCOR-HVB-CE:
Table of Contents

Advertisement

If the area above the ceiling is NOT an attic, position and
secure the ceiling firestop on the ceiling side of the previously
cut and framed hole.
CEILING
NAILS (4 REQUIRED)
Figure 22. Ceiling Firestop (Ceiling Side)
If the area above the ceiling IS an attic, position and secure
the firestop on top of the previously framed hole.
NOTE: Keep insulation away from the flue pipe at least
25mm.
NOTE: There must be NO INSULATION or other
combustibles inside the framed firestop opening.
CEILING
CEILING FIRESTOP
Figure 23.
Attic Firestop
JOIST
CEILING FIRESTOP
NAILS (4 REQUIRED)
RAFTER
Heat & Glo • PIER/ST/L&RCOR-HVB-CE • 2068-900 Rev. H • 6/07
C. Flue Termination
For Horizontal Terminations - To attach and secure the
termination to the last section of horizontal flue refer to the
Cinch Pipe and Termination Cap installation instructions.
• Push on and snap lock as described at the beginning of
the Installing Flue Components section.
• The termination kit should pass through the wall firestops
from the exterior of the building.
• Adjust the termination cap to its final exterior position on
the building and interlock the flue sections.
WARNING: THE TERMINATION CAP MUST BE
!
POSITIONED SO THAT THE ARROW IS
POINTING UP.
For trapezoidal cap termination kits:
• Using screws secure the cap to the exterior wall through
the flanges in the cap.
WARNING: FLUEING TERMINALS SHALL
!
NOT BE RECESSED INTO A WALL OR SID-
ING. FLUE TERMINATION CLEARANCES MUST
BE FOLLOWED TO AVOID FIRE DANGER.
Figure 24. Trapezoid Termination Cap
7 1/4"
(184mm)
29

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Pier-hvb-ceRcor-hvb-ceSt-hvb-ce

Table of Contents