Heat & Glo LCOR-HVB-CE Installer's Manual page 18

Hearth and home technologies gas fireplace installation guide
Hide thumbs Also See for LCOR-HVB-CE:
Table of Contents

Advertisement

ST-HVB-CE
A
Model
PIER-HVB-CE
ST-HVB-CE
L&RCOR-HVB-CE
Figure 5.
Framing Dimensions
18
Shows center of 254mm x 305mm (10"x12") flue framing holes for top and rear flueing.
The center of the hole is 25.4mm (one inch) above the center of the horizontal flue pipe.
D
Framing should be constructed
of 51mm x 102mm (2" x 4")
lumber or heavier.
B
C
A
NOTE: DIMENSIONS SHOWN IN CENTIMETERS AND (INCHES).
A
B
107 (42-1/8)
108 (42-1/2)
121 (47-5/8)
108 (42-1/2)
107 (42-1/8)
108 (42-1/2)
Heat & Glo • PIER/ST/L&RCOR-HVB-CE • 2068-900 Rev. H • 6/07
PIER-HVB-CE
B
C
C
58 (23)
58 (23)
73 (28-3/4)
E
L & R-COR-HVB-CE
A
C
D
E
91 (35-3/4)
122 (48)
91 (35-3/4)
122 (48)
91 (35-3/4)
122 (48)
B

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Pier-hvb-ceRcor-hvb-ceSt-hvb-ce

Table of Contents