Horizontal Flueing – Extended Flue Run; To Install An Extended Horizontal Flue And Termination - Rheem 27 Owner's Manual And Installation Instructions

Electronic continuous flow gas indoor water heater
Table of Contents

Advertisement

FLUEING
Horizontal Flueing – Extended Flue Run
Notes:
Ensure each flue component is fully engaged and the rubber seal on the inner duct is well seated at
each joint.
Each flue component is supplied with screws to connect to the adjacent flue component. The screws are
located in a bag taped to the outside of the flue component.
Refer to diagrams:
"Typical Installation – Horizontal Terminal with One Bend"
"Typical Installation – Horizontal Terminal with Multiple Vertical and Horizontal Sections"
page 63.

To install an extended horizontal flue and termination:

Install the water heater in its final location.
1.
Connect the Water Heater Flue Adapter (PN 295121) to the water heater flue outlet.
2.
Fit the end of the adapter down over the water heater flue outlet as far as it will go.
Ensure there is a minimum 35 mm and maximum 42 mm overlap, the rubber seal on the inner flue
is well seated and the adapter is fully engaged on the water heater flue outlet.
Tighten the ring clamp provided with a screw driver.
Fit the 90° Bend (PN 295118) and rotate in the desired direction of discharge, if the flue is not to have a
3.
change of direction from horizontal to vertical.
Mark the location where the top of the flue is to penetrate the wall to outside of the building.
4.
If the flue is not to have a change of direction from horizontal to vertical, then to accurately mark this
position:
Measure the vertical distance from the floor to
the top of the 90° Bend, and
Measure the horizontal distance from the wall
behind the water heater to the centre of the
90° Bend, and
Then, where the flue is expected to penetrate
the wall, mark the vertical distance up from the
floor and the horizontal distance out from the
wall measured from the previous steps.
Note: If the flue is to have an additional one or two horizontal changes of direction, then it is not
necessary to measure or mark the horizontal distance from the wall behind the water heater to the
centre of the 90° Bend.
Alternatively, using a level, run from the top of the 90° Bend to a location horizontal on the wall
where the flue will penetrate and mark this point on the wall
Measure the horizontal distance, along the proposed flue route, from the end of the 90° Bend to the
where the flue is to penetrate the wall.
Divide this measurement by 50 to calculate the vertical distance fall of the flue (allowing for a 1 in 50
fall).
Measure this distance down from the previous mark placed on the wall.
This point will be the top of the flue termination hole and the flue will have a gradient of 20 mm per
metre of length towards the terminal.
Note: Ensure there are no studs, noggins, pipes or electrical cables located in the wall where the flue is
to penetrate
on page 62, and
66
on

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

864 027 series

Table of Contents