Brick Replacement - Quadra-Fire EPA Certified Woodburning Fireplace 7100FP-GD-B Owner's Manual

Epa certified woodburning fireplace
Hide thumbs Also See for EPA Certified Woodburning Fireplace 7100FP-GD-B:
Table of Contents

Advertisement

R
C. Brick Replacement
The firebox of your fireplace is lined with high quality
firebrick, which has exceptional insulating properties.
There is no need to use a grate; simply build a fire
on the firebox floor. Do not operate the fireplace
without firebrick.
IMPORTANT: The bricks are very similar in size. Be
certain you have the proper brick in the correct location.
Measure the brick size for accuracy.
1.
After the coals are completely cooled, remove
all old brick and ash from unit and vacuum out
firebox.
2.
Remove the brick from the box and lay out to
diagram as shown in Figure 59.1.
3.
Lay bottom bricks in unit.
4.
Install rear bricks on the top of the bottom bricks.
Slide top of bricks under clip on back of firebox
wall and push bottom of brick back.
5.
Install side bricks. Slide top of brick under clips
on side of firebox and push the bottom of the brick
until it is flush with the side of the unit.
Figure 59.2 Brick Pattern
#
1 9" x 3-1/4" x 1-1/4" Angled
2 6-1/4" x 4-1/2" x 1-1/4"
3 9" x 2" x 1-1/4"
4 6-1/4" x 3-1/2" x 1-1/4"
5 9" x 4.5" x 1-1/4"
September 1, 2008
5
Left Side
5
1
5
5
5
2
4
3
Brick Size
(see drawing)
7100FP EPA Woodburning Fireplace
5
5
5
5
1
5
3
4
2
Figure 59.1 Brick Pattern
Use Part 832-2370 when ordering individual brick. Pro-
vide brick dimension or copy this page, mark the desired
brick and take it to your authorized dealer.
5
5
5
5
Back
5
5
5
5
2
2
2
2
Floor
Qty. In Set
2
5
2
2
16
433-1390G
5
5
5
5
5
5
5
2
2
2
2
Right Side
5
1
5
5
4
3
9.0"
1
3-1/4"
5
5
5
1
5
3
4
1-1/4"
Page 59

Advertisement

Table of Contents
loading

This manual is also suitable for:

7100fp-bk-b7100fp-nl-b

Table of Contents