Timer Assembly Replacement - Quadra-Fire EPA Certified Woodburning Fireplace 7100FP-GD-B Owner's Manual

Epa certified woodburning fireplace
Hide thumbs Also See for EPA Certified Woodburning Fireplace 7100FP-GD-B:
Table of Contents

Advertisement

7100FP EPA Woodburning Fireplace
E. Timer Assembly Replacement
CAUTION
Shock Risk
Disconnect power by turning off circuit breaker
BEFORE servicing.
1. Remove both doors, fascia and brick.
2. Remove 2 Phillips head screws and pry open access
door in the bottom of the fireplace with a flat head screw-
driver. Figure 36.1.
Figure 36.1
Open Access Door
3. Remove 2 screws and take off access cover. Figure
36.2.
Figure 36.2
Access Cover
NOTE: The timer assembly included in this kit comes
with the air chamber cover attached. Figure 36.3.
Figure 36.3
Timer Assembly with Air Chamber Cover
(Linkage arm is not included in the kit)
Page 36
Remove 2 screws and
pry open access door.
Air Chamber Cover is
attached to Timer Assembly
4. You will need to disconnect air chamber cover from timer
assembly before installing in the fireplace. Set screws
aside for later use. Figure 36.4.
Figure 36.4
Figure 36.5
5. Remove 2 screws from timer linkage upper arm. Be
careful NOT TO DROP arm in bottom of fireplace. Figure
36.6.
Move arm left
Figure 36.6
6.
Remove 2 screws from timer mounting plate. Figure
37.1.
433-1390G
Remove 2
screws
8/32 Screw installed back to
front and secured with a
lock nut
Be careful not to
drop Linkage Arm
down into fireplace
September 1, 2008
R

Advertisement

Table of Contents
loading

This manual is also suitable for:

7100fp-bk-b7100fp-nl-b

Table of Contents