Bowflex Xtreme 2 Assembly Instructions Manual page 13

Home gym
Hide thumbs Also See for Xtreme 2:
Table of Contents

Advertisement

11
Step 14: Attach Upper Lat Tower to the Lower Assembly
Figure 14
Locate the following items:
• From Step 13 - Upper Lat Tower Assembly
• From Step 11 - Main Assembly
• Item #F - (3) 3/8" X 3/4" Hex Head Bolts
• Item #O - (3) 3/8" Washers
For your safety, use two people to complete this step.
Position the Upper Lat Tower Assembly over the Main
Assembly as shown in Figure 14. Insert the base of the Upper
Lat Tower all the way into the top of the Lower Lat Tower on the
Main Assembly.
Align all bolt holes and secure by placing using (1) 3/8"
Washer (Item #O) over (1) 3/8" X 3/4" Hex Head Bolt (Item
#F) in the upper, back hole.
Then place (2) 3/8" Washers over (2) 3/8" X 3/4" Hex Head
Bolts - one washer per bolt, and loosely secure the lower, side
holes, as shown in Figure 14.
Do not tighten hardware from Step 14 at this time.
Step 15: Attach the Lat Pulley Housing
Locate the following items:
• Item #28 - Lat Pulley Housing
• From Step 14 - Main Assembly
• Item #G - (2) 3/8" X 1" Hex Head Bolts
• Item #O - (2) 3/8" Washers
Remove the plastic cap from the 3/8" X 4 1/2" Bolt (Item
#AA) already installed on the back of the Lat Pulley
Housing. Tighten this bolt until it is "finger tight" - you
will be removing and re-installing this bolt during Step 17.
Place the brackets of the Lat Pulley Housing (Item #28) on
either side of the Lat Tower, aligning the bolt holes in the
bracket with the bolt holes in the Lat Tower, as shown in
Figure 15.
Place (2) 3/8" Washers (Item #O) over the ends of (2) 3/8" X
1" Hex Head Bolts (Item #G) - one washer per bolt. Secure
the Lat Pulley Housing to the Lat Tower by screwing the
bolts loosely into the aligned holes as shown in Figure 15.
Do not tighten hardware from Step 15 at this time.

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents