Framing And Clearances; Selecting Appliance Location - Heat & Glo SL-950TR-E Owner's Manual

Direct vent gas appliance heater
Hide thumbs Also See for Heat & Glo SL-950TR-E:
Table of Contents

Advertisement

3 3

Framing and Clearances

NOTE:
• Illustrations refl ect typical installations and are FOR DESIGN
PURPOSES ONLY.
• Illustrations/diagrams are not drawn to scale.
• Actual installation may vary due to individual design
preference.
A. Selecting Appliance Location
When selecting a location for your appliance it is important to
consider the required clearances to walls (see Figure 3.1).
A
L
F
A
J
J
M
Models
A
in.
42
SL-550TR-IPI-E
SL-550TR-E
mm
1067
in.
45-1/2
SL-750TR-IPI-E
SL-750TR-E
mm
1156
in.
50-1/2
SL-950TR-IPI-E
SL-950TR-E
mm
1283
Figure 3.1 Appliance Locations
8
C
In addition to these framing dimensions, also reference the following sections:
• Clearances and Mantel Projections (Section 3.C and 3.E)
• Vent Clearances and Framing (Section 6).
K
B
C
D
37
59-1/2
940
1511
See Section
42
64-3/8
E for Alcove
1067
1635
Installation
49
71-1/2
1245
1816
Heat & Glo • SL-550 / 750 / 950TR-E • 2118-900 Rev. K • 9/08
NOTE: For actual appliance dimensions refer to Sec-
tion 16.
D
B
I
E
F
G
H
Min.
Min.
1
1/2
44
62-1/4
25
13
1118
1581
1
1/2
45-1/2
64-3/8
25
13
1156
1635
1
1/2
50-1/2
71-1/2
25
13
1283
1816
WARNING
Fire Risk
Provide adequate clearance:
• Around air openings
• To combustibles
• For service access
Locate appliance away from traffi c areas.
C
G
I
J
K
L
16-1/4
48-1/2
68-3/4
15-1/16
413
1232
1746
383
16-1/4
48-1/2
68-3/4
16-5/8
413
1232
1746
422
16-1/4
50-1/2
71-1/2
19-1/2
413
1283
1816
495
N
E
F
A
G
M
N
7-1/2
7-1/8
191
181
7-1/2
9
191
229
9-1/4
11-5/8
235
295

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents