Wall Penetration Framing - Heat & Glo SL-950TR-E Owner's Manual

Direct vent gas appliance heater
Hide thumbs Also See for Heat & Glo SL-950TR-E:
Table of Contents

Advertisement

B. Wall Penetration Framing
Combustible Wall Penetration
Whenever a combustible wall is penetrated, you must
frame a hole for the wall shield fi restop(s). The wall shield
fi restop maintains minimum clearances and prevents cold
air infi ltration.
• The opening must be framed on all four sides using the
same size framing materials as those used in the wall
construction.
• SLP pipe - A wall shield fi restop must be placed on each
side of an interior wall. A minimum 1-1/2 in. (38 mm)
overlap of attached heat shields must be maintained.
• DVP pipe - A wall shield fi restop is required on one side
only on interior walls. If your local inspector requires a
wall shield fi restop on both sides, then both wall shield
fi restops must have a heat shield (refer to Section 16.B.)
attached to them.
• See Section 8.M. for information for regarding the in-
stallation of a horizontal termination cap.
Non-Combustible Wall Penetration
If the hole being penetrated is surrounded by noncom-
bustible materials such as concrete, a hole with diameter
one in. greater than the pipe is acceptable.
Whenever a non-combustible wall is penetrated, the wall
shield fi restop is only required on one side and no heat
shield is necessary.
28
Heat & Glo • SL-550 / 750 / 950TR-E • 2118-900 Rev. K • 9/08
10 in.
10 in.
10 in.
12 in.
A*
B*
A*
in.
36 1/2
SL-550TR-E
mm
927
in.
41
SL-750TR-E
mm
1041
in.
44
SL-950TR-E
mm
1118
* Shows center of vent framing hole for top or rear venting.
The center of the hole is one (1) inch (25.4 mm) above the
center of the horizontal vent pipe.
Figure 6.2 Exterior Wall Hole
C
D
B*
C
D
24 3/8
35 1/2
23 3/8
619
902
594
27 7/8
40
26 7/8
708
1016
683
31 7/8
43
30 7/8
810
1092
784

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents