Example B. Vertical Mounting with Vertical Vent Run
Termination
2'-0"
MIN
90deg
Elbow
90deg
90deg
Elbow
Elbow
Vertical
Flex Pipe
Figure 8b. VerticaI Linear Power Vent with Vertical Vent Run
Installing the Linear Power Vent
1.
The linear power vent can be installed to existing stud construction
or directly to cement wall or roof. The LDVPV58 must maintain the
clearance to combustibles as shown in Figure 10. The required
service access panel must be framed at 28" X 18". To enclose
the service access panel, (at less than 2") a minimum 30% free
air must be supplied at all times.
2.
Plug the power chord into the available slot in the linear power
vent.
3.
Secure all venting joints with at least three screws and ensure
that the joints are properly sealed by applying high temperature
silicone.
18 1/2
34 7/8
Access Cover
Top View
Figure 9. LDVPV58 Power Vent overall dimensions.
Part No. XG0650
Installation
90deg
Elbow
Vertical Installed
Linear Power Vent
LDVPV58
Important:
Maximum Vent Run not to exceed
Seventy (70'-0") feet.
11
33 1/8
Side View

Framing Dimensions

5 MIN
Must be left clear on both
ends of Power Vent for
adequate ventilation.
5
2 MIN
MIN
Figure 10. LDVPV58 Power Vent framing dimensions.
Wiring Installation
Connect the wiring to the linear power vent as outlined in the previ-
ous section, and connect the wiring to the fireplace as outlined in the
schematic below. Ensure that the proper clearances are maintained
for the wiring and conduit. When installing the wiring it must never run
above the vent run and it must be at least 1" clear of all venting.
1" Clearance
Figure 11. Conduit and Wiring Clearances.
H52-DF Gas Fireplace
181/2
5 MIN
Access Cover
Vent
Louvres
5
MIN
Page 9
1/2
MIN

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents